Walkthrough · Provider

Working as the provider

You size the work, plan it, deliver it, check it and ship it. This is the path a work agreement takes from your side, with the default rules.

1. Set up the project

  1. 1

    Start or join a project

    in Projects

    Start one and choose Provider as your side, or ask an existing member to add you by your sign-in email. Then add the consumer's people by email, each with their side.

  2. 2

    Check the rules and the cycle length

    in Projects → your project

    As the provider you manage the project: its name, members, the Who decides rules and the cycle length. Agree the rules with the consumer before work starts, since they change who has to act at each step. See Settings and who decides.

2. Define and size a work agreement

  1. 3

    Create the work agreement and its scopes

    Either sidein Work agreements

    Either side can create a work agreement and propose scopes. Give each scope a description and attach documents (uploaded files or links) for anything the other side needs to read. Add the cards that make up each scope.

    The other side agrees or rejects each scope you propose; you do the same for theirs. A rejected scope comes back to you under Rework rejected scopes: change it or its cards, then put it forward again.

  2. 4

    Propose a size for every card

    Providerin Overview → Size these cards

    Once every scope is agreed and has cards, the work agreement moves to Sizing. Pick a size from XS to XL for each card. The consumer then agrees or withholds agreement.

    If they withhold, the card shows under Agreement withheld: re-size with their note. Propose a new size (or the same one, with an explanation) and it goes back to them.

  3. 5

    Agree the consumer's order

    Providerin Overview → Agree the work agreement order

    With every card sized and agreed, the work agreement moves to Prioritizing. The consumer puts its cards in order and proposes that order. When you agree, the work agreement is released: its cards land on the delivery board, committed and ready.

3. Deliver

  1. 6

    Plan cycles

    Providerin Delivery

    Put committed cards into cycles. Cycles follow the project's calendar and cycle length.

  2. 7

    Move cards across the board

    Providerin Delivery

    Move a card from Mutually Agreed to Awaiting Engineering Capacity, then In Progress, then Pending Release Approval when it's ready to check. You can move a card back, or send it back to the backlog; doing so clears any sign-offs and takes it out of its release.

    The consumer ranks the board with ↑/↓, so work from the top of each column.

  3. 8

    Block a card when you're stuck

    Providerin Delivery or the card

    Mark a card blocked with a reason: resourcing, dependency, technical, other, or waiting on consumer. Waiting on consumer needs a note saying what you need. The card then shows on the consumer's overview under The provider is waiting on you, and their answer unblocks it. Other blocks stay on your own Blocked work list until you clear them. A blocked card can't move forward or be signed off.

4. Approve and ship

  1. 9

    Sign off QA

    Providerin Overview → Sign off for release

    On Pending Release Approval you sign off Provider QA and the consumer signs off acceptance, in either order. When both have, the card moves to Awaiting Release. Either side can reject instead, which clears both sign-offs and raises a defect against the card.

  2. 10

    Ship a release

    Providerin Delivery → Awaiting Release, or Releases

    Group approved cards into a release and ship it; only then are they Done. On the board you can drop cards onto each other to build a release, use New release on a card, ship a planned release, or Release all to put every loose approved card in a new release and ship it in one step.

5. Handle changes and defects

  1. 11

    Decide change requests

    Providerin Change requests

    By default the provider accepts or rejects change requests, straight from Submitted or after marking them Under review. Accepting makes a new card, which then gets sized and prioritized like any other; accepting a resize changes the related card's size.

  2. 12

    Triage defects

    Providerin Overview → Triage reported defects

    Confirm a reported defect, or mark it not a defect. Each defect gets a fix card that starts with the defect's severity as its proposed priority. Once that priority is agreed, your size commits the fix card straight away, with no wait for the consumer.

More on both in Changes and updates.

Your checklist

  • Open Home first. Everything under Waiting on you is something only you can move.
  • Size cards promptly: nothing in a work agreement can be ordered until every card is sized and agreed.
  • Use “waiting on consumer” blocks for questions, so they appear on the consumer's overview instead of in email.
  • Ship releases from the board; a card isn't Done until its release goes out.